This 2,000 m² medical-device cleanroom project in Jiangsu, China, was completed in 2023 as a turnkey delivery. The confirmed scope includes cleanroom panels, doors, windows, installation and EPC delivery. The photographs show room access and door-to-panel interfaces.
Location: Jiangsu, China
Project area: 2,000 m²
Completed: 2023
Delivery: Turnkey cleanroom project
Project Delivery Summary

| Location and industry | Jiangsu, China · Medical device manufacturing |
|---|---|
| Project area and completion | 2,000 m² · Completed in 2023. |
| Delivery model | Turnkey cleanroom project. |
| Project scope | Cleanroom panels, doors and windows; installation and EPC delivery. |
| Enclosure interfaces | Door frames and glazing coordinated with panel walls and workshop access. |
For a similar project: Room layout, equipment access, door schedule, glazing and service openings.
Project context


Medical device facilities need room layouts that support their specific manufacturing steps. A long corridor can connect multiple production and support rooms, but each opening is also a junction between wall panels, frames, glazing and traffic routes. Coordinating those details early helps avoid rework when equipment layouts and access requirements become final.
Enclosure and delivery scope
The photographs show a blue-door corridor and a double-door assembly set into the panel wall. AILV’s scope included the cleanroom enclosure components and project installation/EPC work. The visible finish shows how doors and wall panels fit together along the corridor.
What should be coordinated around a medical-device workshop door?
The corridor and double-door photographs highlight where a workshop opening meets the panel wall and access route.
- Opening: review clear dimensions and equipment movement against the room layout.
- Door assembly: confirm swing direction, glazing and hardware in the door schedule.
- Wall interface: align the frame with adjacent panel modules and ceiling junctions.
These are review questions for comparable workshops, not claims about the exact specification selected here. AILV’s confirmed project scope included panels, doors, windows, installation and EPC delivery. The images show product integration, but do not establish the panel core, measured cleanliness class or completed validation.
For a similar layout, review cleanroom planning and interface coordination before confirming openings and the delivery scope.
For a comparable project, share the room functions, layout, panel requirements, door and window schedule, service openings and desired delivery scope. AILV can review the enclosure package and discuss installation or EPC responsibilities against the actual brief.