Services / Existing Cleanroom Facilities
Upgrade the Cleanroom You Already Operate
Plan a cleanroom renovation, refurbishment, system retrofit or expansion around the facility you have.
AILV can coordinate the agreed engineering package: room construction, HVAC, controls, installation, commissioning and energy-efficiency assessment. Start with current conditions, retained equipment, target requirements and the work your production schedule can accommodate.

One Coordinated Scope
Renovation, Refurbishment, Retrofit or Expansion
Mark what will stay and what will change on the existing layout. Show where old and new systems meet. Ask for separate scopes and named responsibilities for enclosure work, expansion and system upgrades.
Room & Enclosure Refurbishment
Review walls, ceilings, doors, glazing, joints and service openings. Check the installed construction before selecting replacement panels or changing access arrangements.
Cleanroom Expansion
Assess the added rooms, people, equipment and process loads. Coordinate the new area with retained air systems, circulation routes, building services and connection points.
HVAC Upgrade & Retrofit
Review AHUs or FFUs, filtration, supply, return and exhaust paths, fan duty and system pressure losses. Define the equipment, ductwork and balancing changes required.
Control System Upgrade
Review sensors, control sequences, alarms, trends and available interfaces. Define the controller and monitoring changes, functional checks and handover information.
Energy Efficiency Upgrade
Measure the existing operating baseline, screen improvement options and define the comparison method. Maintain the environmental and process conditions required for the room.
Installation & Recommissioning
Coordinate work access, protection, system changeovers, inspection points and start-up. Agree the tests, operating conditions and records required before releasing the changed area.
Engineering illustrations for scope planning.
Measure Before Selecting Equipment
Cleanroom HVAC, Controls and Energy Upgrades

Project photographs illustrate engineering interfaces. The gallery is not a before-and-after retrofit case study.
Establish the System Baseline
Record the room conditions the upgrade must maintain. Check the recirculation, make-up air and exhaust duties against measured airflow and fan power. Include filter and system pressure losses, operating hours and process loads in the review.
Define the Control Changes
Review sensors, point lists, control sequences, alarms, trends and available equipment interfaces. Coordinate pressure and fan-control behavior, including door operation and changing filter resistance, then specify functional checks for the revised system.
Compare Improvement Options
Assess fans and drives, filtration resistance, air distribution, operating modes and heating/cooling interactions as a system. Agree the baseline and post-work comparison method before presenting a savings estimate or payback calculation.
Energy assessment is constrained by the room’s required performance. Reduced airflow or revised operating modes need a project-specific review and verification before use.
Existing Facility / Controlled Work Sequence
Plan Work Around the Operating Facility
Identify the areas that can remain in use, shared services, temporary separation, material routes and system tie-ins. Assess the proposed work against process and contamination risks before agreeing the sequence.
- 01
Survey the Existing Facility
Review drawings, room conditions, installed systems, access and the proposed changes. Record missing inputs and items requiring site verification.
- 02
Define Scope & Work Phases
Agree retained and replaced equipment, responsibilities, temporary boundaries, connection points and shutdown or changeover windows.
- 03
Carry Out the Agreed Works
Coordinate enclosure, HVAC, controls and utility interfaces. Inspect concealed details and record changes before closing the construction.
- 04
Commission, Test & Hand Over
Complete the agreed start-up and checks, close outstanding items and issue the specified drawings, equipment information and commissioning records.
Illustrative planning sequence. Access, shutdown windows and return-to-use conditions are agreed for the actual facility.

Retain, Repair or Replace
Check the Installed Interfaces
Matching panel thickness or appearance does not confirm compatibility. Review the existing joint, perimeter profiles, support arrangement, door frames, glazing and service openings before deciding what to retain.
For expansion, check how the new area connects to existing room boundaries, air systems and equipment routes. Include capacity, access, structural and utility interfaces in the engineering review.
Define the Evidence Before Work Starts
Commissioning, Testing and Handover
Agree the post-work checks, acceptance criteria and responsible parties before construction. Select tests for the systems and room conditions affected by the change, including the relevant as-built, at-rest or operational state.
Agree the test plan before the shutdown. It may cover air balance, airflow, room pressure, temperature and humidity, installed filters, particle counts and controls. Name the test method, operating condition, record and person responsible for acceptance.
Keep before-and-after records for the HVAC retrofit. Before changing an AHU, record measured supply, return and exhaust flows, fan settings, filter pressure drop and room pressure under a stated operating condition. Ask the balancing contractor to repeat the agreed measurements after the work. Retain both records, note any differences in test conditions, and name the HVAC contractor, controls specialist and owner who will review the handover.
Review the Responsibility and Handover Matrix
| Party / Workstream | Scope to Agree |
|---|---|
| AILV engineering package | Survey basis, design deliverables, agreed supply and site works, HVAC and controls interfaces, commissioning scope and documentation. |
| Facility owner | Process and operating requirements, existing records, site access, shutdown authorization and the acceptance or return-to-use route. |
| Other appointed parties | Any civil, structural, process-equipment, utility or local-approval work assigned outside the AILV package. |
Specify the Handover Records
- Updated drawings and the retained/replaced equipment schedule.
- Agreed control sequences, point and alarm information, and equipment documentation.
- Installation inspections, commissioning and test records with the agreed conditions.
- Operating, maintenance and training information included in the contract.
For applicable pharmaceutical facilities, integrate the work with the site’s change-control, contamination-control and qualification requirements. Cleanroom testing, process validation and the owner’s release decision are distinct responsibilities.
Engineering RFQ / Existing-Facility Review
Request a Cleanroom Renovation Quotation
Send the drawings and records you have. AILV can identify gaps, list what stays and what needs replacing, and agree who handles each item. That scope forms the basis for the quotation.
Information for a Renovation or Expansion Assessment
- Facility: country, industry, current room plans, dimensions and photographs.
- Required change: the operating problem, proposed process, capacity or layout change, and target criteria.
- Retained systems: enclosure details, production equipment, HVAC and utility drawings, equipment schedules and available maintenance records.
- Controls and data: controller/sensor information, point lists, sequences, alarms, trends and available energy or submeter records.
- Work restrictions: operating areas, shutdown windows, access, work hours, material routes and owner/local-contractor packages.
- Acceptance: available test records and the required commissioning, qualification and handover scope.
albert@ailvtech.com · +86 173 0063 0130
Professional Engineering References
Technical Basis and Applicable Requirements
These references inform the assessment and engineering method. Project requirements, local rules and the agreed scope determine the actual design and acceptance work.
Sources and Applicability
- ISO 14644-4:2022
Design, construction and start-up guidance that also covers refurbished and modified installations.
- ISO 14644-3:2019
Cleanroom performance test methods; select the relevant checks and occupancy state for the changed installation.
- ISO 14644-16:2019
Energy-management guidance for existing and new clean spaces while retaining required performance.
- ASHRAE 2023 — Clean Spaces
Engineering discussion of clean-space air systems, monitoring, controls and commissioning.
- LBNL — Self-benchmarking Guide for Cleanrooms (2009)
A baseline and investigation method. Historical benchmarks are not AILV measurements or a project savings forecast.
- WHO — HVAC for Non-Sterile Pharmaceutical Products (2018)
A pharmaceutical HVAC reference for applicable projects, including change review and system documentation.
- EU GMP Annex 1 — 2022 Revision
For applicable sterile-medicinal-product facilities, review the change against the site contamination-control and requalification requirements.
References reviewed 14 November 2026. Public ISO catalogue scopes were used; no paid clauses are reproduced. References are not AILV certifications or measured project results.
Service provider: AILV — Zhejiang Ailv Purification Technology Co., Ltd.
Procurement Questions
Cleanroom Renovation & Retrofit FAQ
How do renovation, refurbishment, retrofit and expansion differ?
Use the project brief to define the work. Refurbishment can renew the room enclosure and finishes; a retrofit changes installed systems or interfaces; expansion adds capacity or floor area. One cleanroom renovation contract can combine these activities. Compare the proposed work and retained systems rather than relying on the service label alone.
Can renovation work be phased around ongoing production?
Phasing depends on the facility, contamination risks, access and shared services. Identify operating areas, temporary boundaries, material routes and utility isolations before agreeing a work sequence. Some tie-ins or tests can require a shutdown. The owner and project team agree the operating restrictions and conditions for returning each area to use.
Can a cleanroom HVAC retrofit keep the existing walls and equipment?
Possibly, after a condition and capacity review. Check the room envelope, available air paths, fan duty, filters, process loads, utilities and controls against the proposed requirements. AILV can compare retention, repair and replacement options and identify the interfaces that must change.
How is a cleanroom energy efficiency upgrade assessed?
Establish an operating baseline before selecting measures. Review airflow, fan power, pressure losses, schedules, loads and the required room conditions. Compare the post-work results under equivalent operating conditions. Any estimate of savings or payback depends on project measurements, assumptions and energy prices; it is not a fixed percentage.
What information is needed for a control system upgrade?
Provide the existing controller and sensor information, available point lists, operating sequences, alarms and trend records. Identify retained equipment and accessible interfaces. The proposed scope should define control changes, migration or changeover steps, functional checks and handover information for the actual installed system.
What should a cleanroom renovation contractor include in the quotation?
Ask for the survey basis, retained and replaced items, design deliverables, installation scope, work phases, shutdown assumptions and responsible parties. Specify the commissioning and test scope, acceptance criteria and handover records. Identify owner-provided work, local-contractor packages and process-equipment responsibilities so that competing quotations use comparable boundaries.








