
Project case
Guangzhou Cosmetics Cleanroom Workshop Project
A 2,500 m² cosmetics cleanroom workshop in Guangzhou, China, completed in 2025. Review panel, door, observation-window and ceiling-service interfaces.
View project →Real project evidence
Explore AILV cleanroom project examples with photographs, scope information and the enclosure details that matter to buyers. Product supply, installation and EPC responsibilities are stated for each project.

Project case
A 2,500 m² cosmetics cleanroom workshop in Guangzhou, China, completed in 2025. Review panel, door, observation-window and ceiling-service interfaces.
View project →
Project case
Rongdao installation photographs from Changzhou show a green-floored corridor, glazed entry area, door detail and interior room interfaces.
View project →Project case
A 2,000 m² Jiangsu semiconductor construction album follows wall installation, ceiling work, FFU-service coordination and raised-floor assembly.
View project →
Project case
Site 03 combines a local valve and gauge detail, larger insulated utility pipework and an overhead service route for installation planning.
View project →
Project case
Site 02 shows stainless vessels, access platforms and a skid assembly, with pipework and supports integrated around the equipment.
View project →
Project case
Site 01 photographs connect stainless equipment with vertical service drops, valves and overhead pipe routes inside a finished room.
View project →
Project case
A technical photo collection of water-system equipment, storage vessels, valves and pipework for planning pharmaceutical utility interfaces.
View project →
Project case
A 3,500 m² Shandong food-packaging cleanroom workshop completed in 2024, with AILV responsible for design, on-site installation and system commissioning.
View project →
Project case
Jiangsu frozen-food workshop photographs show forming equipment, vertical conveying machinery and product transfer along a production line.
View project →
Project case
A 2,500 m² Jiangsu beverage-filling cleanroom completed in 2023, with AILV responsible for design, on-site installation and system commissioning.
View project →Planning a similar facility? Discuss your requirements with AILV →
Choose each optional purpose separately. Both start off unless you previously allowed that purpose. Your inquiry works either way.
Your name, email, phone number, message and drawings are not sent by these measurement tags. Privacy Policy