The Shanghai PCR laboratory project is documented through access corridors, room entrances and a stainless steel wash station. These photographs show room separation and service points within the laboratory installation.
- Application
- Shanghai PCR Laboratory Installation
- Location
- Shanghai, China
- Review focus
- Project photographs & engineering interfaces
Project Context
PCR laboratory planning needs to follow the intended workflow and the activities assigned to each room. Door positions, transfer arrangements and wash facilities must be reviewed with equipment locations and the routes used by staff and materials. The corridor views are useful for examining access and the relationship between adjoining rooms; they do not by themselves define a biosafety classification. For a comparable facility, provide the operating brief and equipment schedule before agreeing construction and service interfaces. Identify the owner’s workflow requirements and the parties responsible for ventilation design, installation checks and any required testing.
Engineering Interfaces to Review
- Review room entrances and circulation against the intended laboratory workflow.
- Coordinate wash-station services and equipment access with the room layout.
- Agree door, transfer and service interfaces before installation proceeds.
Project Photo Album



Plan a Similar Project
- Laboratory activities, workflow and room schedule.
- Building plans, equipment list and service requirements.
- Requested engineering scope, installation conditions and required records.
Explore related engineering solutions · Review project and EPC responsibilities · Discuss your project with AILV
If the laboratory has to travel as a unit, the mobile PCR laboratory case shows how the workstation and access doors fit inside a containerised building.
The photographs show the recorded site or engineering reference. Room classifications, system performance and acceptance requirements are established through the project specification and records.