Shandong Food-Packaging Cleanroom Workshop

Shandong Food-Packaging Cleanroom Workshop

A 3,500 m² Shandong food-packaging cleanroom workshop completed in 2024, with AILV responsible for design, on-site installation and system commissioning.

This 3,500 m² food-packaging cleanroom workshop in Shandong, China, completed in 2024, is shown through a stainless work area and the adjoining equipment hall. Observation glazing provides a third view of how production equipment and circulation relate across the room boundary. AILV was responsible for design, on-site installation and system commissioning.

Location
Shandong, China
Industry
Food packaging
Project area
3,500 m²
Completed
2024

Delivery Responsibilities & Handover

Project stage Responsible party
Design AILV
On-site installation AILV
System commissioning AILV

Confirmed Handover Record Types

  • As-built drawings
  • Equipment documentation
  • Installation inspection records
  • System commissioning or test reports

Project Context

The album illustrates the range of interfaces that a packaging project must coordinate: people working at tables, larger processing or packaging equipment, service routes and the openings between rooms. Each area needs a layout suited to its own activity and cleaning requirements.

Engineering Interfaces to Review

  • Map product, packaging-material and personnel routes alongside the equipment layout. Confirm transfer openings and access widths before releasing the wall and door schedules.
  • Coordinate table and equipment positions with cleaning access, electrical points and utility connections. Keep maintenance routes clear when the room and service layouts are developed.
  • Review observation glazing, wall junctions and ceiling interfaces as part of the room system. Agree the required materials, installation details and inspection records for the selected construction.

Project Photo Album

Plan a Similar Project

For a similar food-packaging facility, provide the process flow, equipment and worktable layouts, room drawings, cleaning methods, utility needs and the desired project-delivery package.

Explore related engineering solutions · Review project and EPC responsibilities · Discuss your project with AILV

If the line handles dry powders, agree on the cleaning method before specifying drains and floor finishes. The powder packing room guide explains what to include in the quotation request.

The photographs show the recorded site or engineering reference. Room classifications, system performance and acceptance requirements are established through the project specification and records.