Water and Drainage in a Cosmetics Factory RFQ

Water and Drainage in a Cosmetics Factory RFQ

Specify ingredient and cleaning water, drain locations, sampling points and supplier responsibilities before comparing cosmetics cleanroom engineering quotes.

List ingredient water, cleaning water and wastewater separately in a cosmetics factory RFQ. Mark where each service meets the room or equipment, then assign who supplies it, connects it and checks it at handover. This lets bidders price the same scope for shampoo, body wash and other water-based personal care production.

By Albert Fu · Cleanroom Specialist at AILV

Observation windows and adjacent blue and yellow floor zones in the Guangzhou cosmetics workshop
Room partitions and floor zones in the Guangzhou cosmetics workshop. Drain and utility layouts are specified separately on the project drawings.

Put each water service on the drawings and in the quotation

Ingredient water at the mixer or batch tank

Have the process team mark the source and point of use for each mixer, batch tank or other piece of equipment that takes water as an ingredient. Attach the quality specification and expected demand. Give bidders the required flow, temperature and operating pressure where known, along with any simultaneous draw from other users. Name who supplies any treatment, storage and distribution and who signs off sampling at the agreed points of use.

Cleaning water at the sink or equipment wash point

Identify handheld hoses, parts-washing sinks and equipment cleaning connections by room. Note which surfaces or equipment parts come into contact with the water, the intended cleaning chemicals and whether hot water is needed. Ask the plumber and equipment supplier to agree the connection detail and any backflow protection required by local rules.

Process discharge, wash water and floor drains

Give bidders the equipment outlet levels and expected discharge conditions, including temperature, batch volume and any solids or cleaning chemicals. Show floor outlets, direction of fall, access for cleaning and the downstream connection. Confirm with the local designer which streams can share a route and whether pretreatment or separate collection is required.

Assign the handover checks before bids come back

Use one row per interface in the quotation schedule. Record the room or equipment tag, connection point on the drawing, supplying party, connecting party and acceptance record.

  • Process and equipment supplier. Confirm the utility demand and discharge conditions at the machine connections.
  • Enclosure and local plumbing teams. Coordinate the floor and wall details around the outlets and penetrations. Agree which contractor seals each interface and checks drainage and access.
  • Water-system supplier and manufacturer’s quality team. Put the sampling locations, test responsibilities and acceptance criteria into the handover schedule.

For the wider room scope, review cosmetics and personal-care facility engineering. Send the marked plan and equipment connection schedule when you request an engineering quotation.

Frequently asked questions

Does a shampoo factory need purified water or water for injection?

Set the ingredient-water specification from the formulation, product risk, intended market and the manufacturer’s quality requirements. Use those criteria to select the water system and sampling plan. Include purified water or water for injection only when the applicable requirements or approved project specification call for it.

Should every cosmetics cleanroom have a floor drain?

Mark the rooms where cleaning or production releases water. For each necessary outlet, show the route, service access, equipment discharge conditions and protection against backflow as required by local design rules. Keep dry rooms dry where the approved cleaning plan permits.

Who signs off the ingredient-water system at handover?

Have the water-system supplier confirm connection points and installation checks. Assign the sample points, test criteria, records and release decision in the quotation. The cosmetics manufacturer’s quality team should approve the specification and release criteria.

Technical references

The FDA cosmetics self-inspection checklist covers adequate water supply and drainage, placement of pipes to avoid drips onto exposed materials and regular testing of water used as a cosmetic ingredient. See Buildings and Facilities 1(c) and 1(e) and Laboratory Controls 6(c) for the U.S. inspection context. FDA cosmetics GMP guidelines and inspection checklist

ISO 22716:2007, corrected in May 2008 and confirmed in 2022, provides cosmetics GMP guidance for production, control, storage and shipment. Check the project’s plumbing, discharge and environmental requirements with the responsible local designer. ISO 22716:2007 official scope