Jiangsu Cardiac Stent Cleanroom Project

Jiangsu Cardiac Stent Cleanroom Project

A 1,500 m² turnkey cardiac-stent cleanroom project in Jiangsu, completed in 2024. Review room, workstation and service-interface photographs.

This 1,500 m² cardiac-stent cleanroom project in Jiangsu, China, was completed in 2024 as a turnkey delivery. It is a shared K-STONE / AILV medical-device project reference. The photographs show the room layout and local workstation, washing and service interfaces.

Confirmed Project Delivery

LocationJiangsu, China

Project area1,500 m²

Completed2024

DeliveryTurnkey cleanroom project

Wide panel-lined room with grey flooring and ceiling lights in the Jiangsu cardiac stent project
Overall room view with wall openings, ceiling fittings and circulation space.

From room layout to local details

The main photograph shows a largely open floor area beneath a white ceiling. Door and window positions remain visible around the perimeter. A closer photograph shows a laboratory work unit beside a blue door, while another records a stainless steel washing fixture against the panel wall.

Laboratory work unit beside a blue access door in the Jiangsu cardiac stent project
Work-unit placement and the adjoining access interface.
Stainless steel washing fixture and service connection against a white panel wall
Wall-mounted fixture and service-entry detail from the same project.

What to coordinate for a similar room

Record fixed furniture, equipment access, service entries and cleaning access on the layout before confirming panel openings. Coordinate the wall construction with the selected door and viewing arrangements, then identify which fixture connections need separate installation details.

Browse door and window configurations and the junction reference library. Send your layout and equipment schedule to discuss a turnkey cleanroom engineering package for your medical-device project.