This display-production cleanroom project in Jiangsu, China, is shown through large internal rooms and the support structure beneath a raised floor. The photographs connect the production environment with floor-support and service-space coordination.
- Application
- Jiangsu Display-Production Cleanroom
- Location
- Jiangsu, China
- Review focus
- Project photographs & engineering interfaces
Project Context
One room has a green floor and extensive ceiling lighting; another shows the wall, column and ceiling-module arrangement. The support-structure view highlights the density of raised-floor pedestals and bracing, and the space that needs coordination before installation begins.
Engineering Interfaces to Review
- Set the room grid around process equipment, columns and access routes. Confirm where equipment will enter and how future service work will reach the installed systems.
- Coordinate ceiling modules and overhead services with the room layout. Review the raised-floor grid, pedestal supports, bracing and underfloor service routes separately; confirm load, access and support responsibilities for the selected assemblies.
- Review wall openings, low-level air interfaces and room finishes alongside the approved environmental design. Keep the construction schedule consistent with the equipment and service drawings.
Project Photo Album



Plan a Similar Project
For a comparable display-production facility, share the building and process layouts, equipment dimensions, ceiling and service requirements, room targets and expected engineering delivery boundary.
Explore related engineering solutions · Review project and EPC responsibilities · Discuss your project with AILV
The photographs show the recorded site or engineering reference. Room classifications, system performance and acceptance requirements are established through the project specification and records.