This physicochemical laboratory project in Shanghai, China shows bench layouts, local extraction arms and rooftop ventilation equipment. The views connect the working space with the services and equipment outside the laboratory rooms.
- Application
- Shanghai Physicochemical Laboratory
- Location
- Shanghai, China
- Review focus
- Project photographs & engineering interfaces
Project Context
Bench positions influence operator circulation, instrument access and the routes needed for utilities and extraction. Ceiling-mounted arms must be coordinated with lights and other services, while roof equipment needs access and a planned connection to the building. These photographs provide practical reference points for reviewing the workstation and building-service drawings together. A new laboratory proposal should start with the intended activities and equipment inventory. Identify the substances and tasks requiring specialist review, then agree the ventilation, electrical, water and drainage interfaces with the responsible design team. Define supply and installation duties in the project scope.
Engineering Interfaces to Review
- Coordinate bench layouts, instrument positions and operator circulation.
- Review local extraction connections alongside ceiling services and maintenance access.
- Connect laboratory requirements with rooftop equipment and building-service routes.
Project Photo Album



Plan a Similar Project
- Laboratory activities, building layout and instrument inventory.
- Workstation services, extraction requirements and roof conditions.
- Requested fit-out, system connection and installation responsibilities.
Explore related engineering solutions · Review project and EPC responsibilities · Discuss your project with AILV
For production quality-control work, compare the bench layout in the Zhenjiang QC laboratory when positioning instruments and planning access.
The photographs show the recorded site or engineering reference. Room classifications, system performance and acceptance requirements are established through the project specification and records.